
Chengdu Guiyang high speed railway
- Time of issue:2021-07-10
Chengdu Guiyang high speed railway
(Summary description)Chengdu Guiyang high speed railway, also known as Chengdu Guiyang passenger dedicated line, is a high-speed railway connecting Chengdu, Sichuan Province and Guiyang, Guizhou Province.
- Time of issue:2021-07-10
Chengdu Guiyang high speed railway, also known as Chengdu Guiyang passenger dedicated line, is a high-speed railway connecting Chengdu, Sichuan Province and Guiyang, Guizhou Province. It is an important part of "Lanzhou (West) Guangzhou channel", one of the main channels of "eight vertical and eight horizontal" high-speed railway in the medium and long term railway network planning (2016 Edition).
On December 29, 2008, Chengdu Leshan section of Chengdu Guiyang high speed railway was officially started; On December 20, 2014, Chengdu Leshan section was put into operation; On June 15, 2019, Leshan Yibin section was put into operation; On December 16, Yibin Guiyang section was put into operation, marking the completion and opening of the whole Chengdu Guiyang high-speed railway.
Chengdu Guiyang high-speed railway is 648km long from Chengdu east railway station to Guiyang east railway station, with 24 stations, and the designed maximum speed is 250km / h.
Lianjiaxiang participated as a wire and cable supplier. Product application: power line, signal line. Railway projects have high requirements for cables, so our company will fully cooperate and complete the supply in advance.




Copyright©Shenzhen Lianjiaxiang Technology Co., Ltd. 粤ICP备2022051554号 Powered by www.300.cn SEO navigation